Approvals
Public Environmental Review
Documents relating to the Mulga Rocks project published on the Environmental Protection Agency (WA) website:
> Environmental Protection Authority, WA
PER Appendices
- A1 Assessment of Flora and Vegetation Surveys conducted for the MRUP
- A2 Regional Hibbertia crispula Survey
- B1 Flora Fauna and Radioecology Survey
- B2 A Fauna Survey of the Proposed Mulga Rock Uranium Project
- B3 Camera Trapping Protocol Sandhill Dunnart MRUP
- B4 Gaikhorst response on Sandhill Dunnart
- B5 A Report on the Southern Marsupial Mole
- B6 Fauna Assessment Malleefowl
- B7 Updated Report on Herpetofauna of the Mulga Rock Uranium Project
- B8 Short range endemic fauna at the Mulga Rock Uranium Project
- C1 Stygofauna Pilot Study
- C2 Subterranean Fauna Pilot Study
- D1 Hydrogeological Investigations and Numerical Modelling Kakarook
- D2 Hydrogeological Investigations and Numerical Modelling
- D3 Groundwater Study Lake Minigwal Uranium Prospect
- D4 Mulga Rock Prospect Stage 2 Hydrogeological Investigation
- D5 Report on Groundwater Exploration at Mulga Rock Prospect
- D6 Geochemistry Mineralogy and Hydrogeochemistry at Ambassador
- D7 Physicochemical Characteristics of Tailings from the Mulga Rock Uranium Project
- D8 MRUP Tailing Storage Facility Seepage Analysis
- D9 Surface Water Assessment and Management Plan
- D10 Results of Solute Transport Modelling for In-pit Tailings Storage
- E1 Dispersion Modelling
- F1 Radiation Report and ANSTO Radionuclide Deportment Appendix
- F2 Secular Equilibrium in Ores from the PNC Exploration Site
- F3 Radon Emanation Testwork
- G1 Report of an Ethnographic Survey of the Mulga Rock Uranium Project
- G2 A Survey for Aboriginal Sites in the Cundeelee Minigwal Area April 1982
- G3 A Survey for Aboriginal Sites in the Cundeelee Minigwal Area August 1982
- G4 A Report on an Archaeological Survey of the Proposed Mulga Rock Uranium Project
- G5 An Archaeological Survey for Aboriginal Sites
- H1 Mulga Rock Uranium Project Conceptual Mine Closure Plan
- H2 Terrain Analysis and Materials Characterisation
- H3 MRUP Preliminary Radioactive Waste Management Plan
- I1 Matters of National Environmental Significance Search
- J1 Vimy Stakeholder Consultation File
- K1 MRUP Environmental Management Plans
- L1 MRUP Environmental Scoping Document
- L2 EIA Checklist
Conditional Environmental Management Plans
- Mulga Rock Project Aboriginal Heritage Management Plan
- Mulga Rock Project Flora and Vegetation Monitoring and Management Plan
- Mulga Rock Project Terrestrial Fauna Monitoring and Management Plan
- Mulga Rock Project Groundwater Monitoring and Management Plan
- Mulga Rock Project Tailings Storage Facility Monitoring and Management Plan
- Mulga Rock Project Soil Monitoring and Management Plan (Management-Based)
- Mulga Rock Project Soil Monitoring and Management Plan (Outcome-Based)
- Mulga Rock Project Above Ground Tailings Storage Facility Monitoring and Management Plan
WA Compliance Assessment Reports
- Mulga Rock Project Compliance Assessment Report 2024
- Mulga Rock Project Compliance Assessment Report 2023
- Mulga Rock Project Compliance Assessment Report 2022
- Mulga Rock Project Compliance Assessment Report 2021
- Mulga Rock Project Compliance Assessment Report 2020
- Mulga Rock Project Compliance Assessment Report 2019
- Mulga Rock Project Compliance Assessment Report 2018
Commonwealth EPBC 2013/7083 Plans and Compliance
- Approval of Sandhill Dunnart Conservation Plan Letter – 19 July 2024
- Sandhill Dunnart Conservation Plan – Mulga Rock Project – January 2024 (approved: 19 July 2024)
- Annual Compliance Report 2023
- DCCEEW Letter and Variation Notice – Reporting period now 1 Jan to 31 Dec to be posted in March (added: 7th December 2023)
- Approval of Sandhill Dunnart Conservation Plan Letter – 31 January 2023
- Annual Compliance Report 2022 (added: 9th December 2022)