BASEMENT MINERALISATION

Omahola Project - JORC 2012 1

INCA Deposit ♦

Indicated

100

21.4

260

5,600

12.3

INCA Deposit ♦

Inferred

100

15.2

290

4,400

9.7

Ongolo Deposit #

Measured

100

47.7

187

8,900

19.7

Ongolo Deposit #

Indicated

100

85.4

168

14,300

31.7

Ongolo Deposit #

Inferred

100

94.0

175

16,400

36.3

MS7 Deposit #

Measured

100

18.6

220

4,100

9.1

MS7 Deposit #

Indicated

100

7.2

184

1,300

2.9

MS7 Deposit #

Inferred

100

8.7

190

1,600

3.7

Omahola Project Sub-Total

 

298.2

190

56,600

125.4

CALCRETE MINERALISATION Tumas 3 Deposit - JORC 2012 2

Tumas 3 Deposits ♦

Indicated

100

78.0

320

24,900

54.9

 

Inferred

100

10.4

219

2,265

5.0

Tumas 3 Deposits Total

 

88.4

307

27,165

59.9

Tumas 1, 1E & 2 Project – JORC 2012 3

Tumas 1 & 2 Deposit ♦  Indicated

100

90.4

220

19,860

43.8

Tumas 1 & 2 Deposit ♦  Inferred

100

21.8

206

4,692

10.3

Tumas 1, 1E & 2 Deposits Total

 

112.2

219

24,552

54.1

Sub-Total of Tumas 1, 2 and 3

 

200.6

258

51,717

114.0

Tubas Red Sand Project - JORC 2012 4

Tubas Sand Deposit #

Indicated

100

10.0

187

1,900

4.1

Tubas Sand Deposit #

Inferred

100

24.0

163

3,900

8.6

Tubas Red Sand Project Total

 

34.0

171

5,800

12.7

Tubas Calcrete Resource - JORC 2004 5

Tubas Calcrete Deposit

Inferred

100

7.4

374

2,767

6.1

Tubas Calcrete Total

 

7.4

374

2,767

6.1

Aussinanis Project - JORC 2012- DYL 85% 6

Aussinanis Deposit ♦

Indicated

100

12.3

168

2,000

4.5

Aussinanis Deposit ♦

Inferred

100

62.1

172

10,700

23.6

Aussinanis Project Total

 

74.4

171

12,700

28.1

 

 

 

 

 

 

Calcrete Projects Sub-Total

316.4

231

72,984

160.9

GRAND TOTAL NAMIBIAN RESOURCES

614.6

210

129,584

286.3

Figures have been rounded and totals may reflect small rounding errors.

XRF chemical analysis unless annotated otherwise.

♦ eU3O8 - equivalent uranium grade as determined by downhole gamma logging.

# Combined XRF Fusion Chemical Assays and eU3O8 values.

Where eU3O8 values are reported it relates to values attained from radiometrically logging boreholes.

Gamma probes were calibrated at Pelindaba, South Africa in 2007.  Recent calibrations were carried out at the Langer Heinrich Mine calibration facility in July 2018 and September 2019.

During drilling, probes are checked daily against standard source.

1 ASX Release 4 November 2021 ‘Omahola Basement Project Resource Upgrade to JORC 2012

2 ASX Release 29 July 2021 ‘Drilling at Tumas 3 Delivers Significant Resource Upgrade

3 ASX Release 2 September 2021 ‘Tumas Delivers Impressive Indicated Mineral Resource

4 ASX Release 23 March 2014 ‘Tubas Sands Project – Resource Update

5 ASX Release 27 February 2012 ‘TRS Project Resources Increased

6 ASX Release 31 Mar 2023 ‘Aussinanis Project Resource Upgrade To JORC (2012)

Deposit

Category

Cut-off

Tonnes

U3O8

U3O8

U3O8

(ppm U3O8)

(M)

(ppm)

(t)

(Mlb)

Northern Territory

Angularli Project - JORC 2012 1

Angularli

Inferred

1,500

1.37

10,900

14,917

32.9

Angularli Project Sub-Total

1.37

10,900

14,917

32.9

Western Australia

Mulga Rock Project – JORC 2012 2

Ambassador

Measured

150

5.2

1,100

5,720

12.6

Ambassador

Indicated

150

14.8

800

11,840

26.0

Ambassador

Inferred

150

14.2

420

5,964

13.1

Princess

Indicated

150

2.0

820

1,640

3.6

Princess

Inferred

150

1.3

420

546

1.2

Mulga Rock East Total

 

37.5

685

25,710

56.5

Shogun

Indicated

150

2.2

680

1,496

3.2

Shogun

Inferred

150

0.9

290

261

0.6

Emperor

Inferred

150

30.8

440

13,522

29.8

Mulga Rock West Total

 

33.9

451

15,279

33.6

Mulga Rock Project Sub-Total

 

71.4

574

40,989

90.1

GRAND TOTAL AUSTRALIAN RESOURCES

72.8

768

55,906

123.0

GRAND TOTAL RESOURCES

 

687.4

270

185,490

409.3

Notes:

Figures may not add due to rounding.

Using combined chemical and radiometric grades.

1 ASX Release 3 July 2023 ‘Robust Resource Upgrade Delivered At Angularli

2 ASX Release 12 July 2017 ‘Significant Resource Update – Mulga Rock Cracks 90Mlbs

 

Base Metal Resources Mulga Rock Project

Deposit 1

Class

Tonnes (Mt)

Cu (ppm)

Cu (Kt)

Zn (ppm)

Zn (Kt)

Ni (ppm)

Ni (Kt)

Co (ppm)

Co (Kt)

Sc (ppm)

Sc (Kt)

Princess

Indicated

1.3

750

0.9

1270

1.6

440

0.6

210

0.3

60

0.07

Princess

Inferred

2.5

270

0.7

510

1.3

250

0.6

140

0.4

20

0.04

Ambassador

Indicated

13.2

330

4.4

1330

17.5

600

7.9

250

3.3

30

0.35

Ambassador

Inferred

16.1

160

2.6

320

5.2

310

5.1

170

2.7

20

0.33

TOTAL

33.1

260

8.6

770

25.6

430

14.2

200

6.7

25

0.80

Notes:

Figures may not add due to rounding.

Base metals mineral resources are contained wholly within the uranium Mineral Resource and are reported at a 150ppm U3O8 cut-off grade.

1 ASX Release 17 September 2015 ‘Improved Economics for the Mulga Rock Project Increases the Mineral Resource Estimate’

JORC Ore Reserves

Deposit

Category

Cut-off

Tonnes

U3O8

U3O8

U3O8

(ppm U3O8)

(M)

(ppm)

(t)

(Mlb)

Namibia

Tumas Project - JORC 2012 1

Tumas 3

Probable

150

44.9

414

18,600

41.0

Tumas 1E

Probable

150

29.5

266

7,850

17.3

Tumas 1 and 2

Probable

150

13.9

292

4,090

9.0

Tumas Project Sub-Total

88.4

346

30,540

67.3

Western Australia

Mulga Rock Project – JORC 2012 2

Ambassador

Proved

150

5.3

1,055

5,580

12.3

Ambassador

Probable

150

14.1

775

10,890

24.0

Princess

Proved

150

-

-

-

-

Princess

Probable

150

1.7

870

1,500

3.3

Mulga Rock East Total

21.1

852

17,970

39.6

Shogun

Proved

150

-

-

-

-

Shogun

Probable

150

1.6

760

1,225

2.7

Mulga Rock West Total

1.6

766

1,225

2.7

Mulga Rock Project Sub-Total

22.7

845

19,195

42.3

GRAND TOTAL ORE RESERVES

 

111.1

275

49,735

109.6

Notes:

Figures may not add due to rounding.

1ASX Release 2 February 2023 ‘Strong Results From Tumas Definitive Feasibility Study

2 ASX Release 4 September 2017 ‘Major Ore Reserve Update – Moving to the Go Line