JORC Mineral Resources
Deposit |
Category |
Cut-off |
Tonnes |
U3O8 |
U3O8 |
U3O8 |
|
(ppm U3O8) |
(M) |
(ppm) |
(t) |
(Mlb) |
|||
BASEMENT MINERALISATION |
|||||||
Omahola Project - JORC 2012 1 |
|||||||
INCA Deposit ♦ |
Indicated |
100 |
21.4 |
260 |
5,600 |
12.3 |
|
INCA Deposit ♦ |
Inferred |
100 |
15.2 |
290 |
4,400 |
9.7 |
|
Ongolo Deposit # |
Measured |
100 |
47.7 |
187 |
8,900 |
19.7 |
|
Ongolo Deposit # |
Indicated |
100 |
85.4 |
168 |
14,300 |
31.7 |
|
Ongolo Deposit # |
Inferred |
100 |
94.0 |
175 |
16,400 |
36.3 |
|
MS7 Deposit # |
Measured |
100 |
18.6 |
220 |
4,100 |
9.1 |
|
MS7 Deposit # |
Indicated |
100 |
7.2 |
184 |
1,300 |
2.9 |
|
MS7 Deposit # |
Inferred |
100 |
8.7 |
190 |
1,600 |
3.7 |
|
Omahola Project Sub-Total |
|
298.2 |
190 |
56,600 |
125.4 |
||
CALCRETE MINERALISATION Tumas 3 Deposit - JORC 2012 2 |
|||||||
Tumas 3 Deposits ♦ |
Indicated |
100 |
78.0 |
320 |
24,900 |
54.9 |
|
|
Inferred |
100 |
10.4 |
219 |
2,265 |
5.0 |
|
Tumas 3 Deposits Total |
|
88.4 |
307 |
27,165 |
59.9 |
||
Tumas 1, 1E & 2 Project – JORC 2012 3 |
|||||||
Tumas 1 & 2 Deposit ♦ Indicated |
100 |
90.4 |
220 |
19,860 |
43.8 |
||
Tumas 1 & 2 Deposit ♦ Inferred |
100 |
21.8 |
206 |
4,692 |
10.3 |
||
Tumas 1, 1E & 2 Deposits Total |
|
112.2 |
219 |
24,552 |
54.1 |
||
Sub-Total of Tumas 1, 2 and 3 |
|
200.6 |
258 |
51,717 |
114.0 |
||
Tubas Red Sand Project - JORC 2012 4 |
|||||||
Tubas Sand Deposit # |
Indicated |
100 |
10.0 |
187 |
1,900 |
4.1 |
|
Tubas Sand Deposit # |
Inferred |
100 |
24.0 |
163 |
3,900 |
8.6 |
|
Tubas Red Sand Project Total |
|
34.0 |
171 |
5,800 |
12.7 |
||
Tubas Calcrete Resource - JORC 2004 5 |
|||||||
Tubas Calcrete Deposit |
Inferred |
100 |
7.4 |
374 |
2,767 |
6.1 |
|
Tubas Calcrete Total |
|
7.4 |
374 |
2,767 |
6.1 |
||
Aussinanis Project - JORC 2012- DYL 85% 6 |
|||||||
Aussinanis Deposit ♦ |
Indicated |
100 |
12.3 |
168 |
2,000 |
4.5 |
|
Aussinanis Deposit ♦ |
Inferred |
100 |
62.1 |
172 |
10,700 |
23.6 |
|
Aussinanis Project Total |
|
74.4 |
171 |
12,700 |
28.1 |
||
|
|
|
|
|
|
||
Calcrete Projects Sub-Total |
316.4 |
231 |
72,984 |
160.9 |
|||
GRAND TOTAL NAMIBIAN RESOURCES |
614.6 |
210 |
129,584 |
286.3 |
Figures have been rounded and totals may reflect small rounding errors.
XRF chemical analysis unless annotated otherwise.
♦ eU3O8 - equivalent uranium grade as determined by downhole gamma logging.
# Combined XRF Fusion Chemical Assays and eU3O8 values.
Where eU3O8 values are reported it relates to values attained from radiometrically logging boreholes.
Gamma probes were calibrated at Pelindaba, South Africa in 2007. Recent calibrations were carried out at the Langer Heinrich Mine calibration facility in July 2018 and September 2019.
During drilling, probes are checked daily against standard source.
1 ASX Release 4 November 2021 ‘Omahola Basement Project Resource Upgrade to JORC 2012’
2 ASX Release 29 July 2021 ‘Drilling at Tumas 3 Delivers Significant Resource Upgrade’
3 ASX Release 2 September 2021 ‘Tumas Delivers Impressive Indicated Mineral Resource’
4 ASX Release 23 March 2014 ‘Tubas Sands Project – Resource Update’
5 ASX Release 27 February 2012 ‘TRS Project Resources Increased’
6 ASX Release 31 Mar 2023 ‘Aussinanis Project Resource Upgrade To JORC (2012)’
Deposit |
Category |
Cut-off |
Tonnes |
U3O8 |
U3O8 |
U3O8 |
(ppm U3O8) |
(M) |
(ppm) |
(t) |
(Mlb) |
||
Northern Territory |
||||||
Angularli Project - JORC 2012 1 |
||||||
Angularli |
Inferred |
1,500 |
1.37 |
10,900 |
14,917 |
32.9 |
Angularli Project Sub-Total |
1.37 |
10,900 |
14,917 |
32.9 |
||
Western Australia |
||||||
Mulga Rock Project – JORC 2012 2 |
||||||
Ambassador |
Measured |
150 |
5.2 |
1,100 |
5,720 |
12.6 |
Ambassador |
Indicated |
150 |
14.8 |
800 |
11,840 |
26.0 |
Ambassador |
Inferred |
150 |
14.2 |
420 |
5,964 |
13.1 |
Princess |
Indicated |
150 |
2.0 |
820 |
1,640 |
3.6 |
Princess |
Inferred |
150 |
1.3 |
420 |
546 |
1.2 |
Mulga Rock East Total |
|
37.5 |
685 |
25,710 |
56.5 |
|
Shogun |
Indicated |
150 |
2.2 |
680 |
1,496 |
3.2 |
Shogun |
Inferred |
150 |
0.9 |
290 |
261 |
0.6 |
Emperor |
Inferred |
150 |
30.8 |
440 |
13,522 |
29.8 |
Mulga Rock West Total |
|
33.9 |
451 |
15,279 |
33.6 |
|
Mulga Rock Project Sub-Total |
|
71.4 |
574 |
40,989 |
90.1 |
|
GRAND TOTAL AUSTRALIAN RESOURCES |
72.8 |
768 |
55,906 |
123.0 |
||
GRAND TOTAL RESOURCES |
|
687.4 |
270 |
185,490 |
409.3 |
Notes:
Figures may not add due to rounding.
Using combined chemical and radiometric grades.
1 ASX Release 3 July 2023 ‘Robust Resource Upgrade Delivered At Angularli’
2 ASX Release 12 July 2017 ‘Significant Resource Update – Mulga Rock Cracks 90Mlbs’
Base Metal Resources Mulga Rock Project
Deposit 1 |
Class |
Tonnes (Mt) |
Cu (ppm) |
Cu (Kt) |
Zn (ppm) |
Zn (Kt) |
Ni (ppm) |
Ni (Kt) |
Co (ppm) |
Co (Kt) |
Sc (ppm) |
Sc (Kt) |
Princess |
Indicated |
1.3 |
750 |
0.9 |
1270 |
1.6 |
440 |
0.6 |
210 |
0.3 |
60 |
0.07 |
Princess |
Inferred |
2.5 |
270 |
0.7 |
510 |
1.3 |
250 |
0.6 |
140 |
0.4 |
20 |
0.04 |
Ambassador |
Indicated |
13.2 |
330 |
4.4 |
1330 |
17.5 |
600 |
7.9 |
250 |
3.3 |
30 |
0.35 |
Ambassador |
Inferred |
16.1 |
160 |
2.6 |
320 |
5.2 |
310 |
5.1 |
170 |
2.7 |
20 |
0.33 |
TOTAL |
33.1 |
260 |
8.6 |
770 |
25.6 |
430 |
14.2 |
200 |
6.7 |
25 |
0.80 |
Notes:
Figures may not add due to rounding.
Base metals mineral resources are contained wholly within the uranium Mineral Resource and are reported at a 150ppm U3O8 cut-off grade.
1 ASX Release 17 September 2015 ‘Improved Economics for the Mulga Rock Project Increases the Mineral Resource Estimate’
JORC Ore Reserves
Deposit |
Category |
Cut-off |
Tonnes |
U3O8 |
U3O8 |
U3O8 |
(ppm U3O8) |
(M) |
(ppm) |
(t) |
(Mlb) |
||
Namibia |
||||||
Tumas Project - JORC 2012 1 |
||||||
Tumas 3 |
Probable |
150 |
44.9 |
414 |
18,600 |
41.0 |
Tumas 1E |
Probable |
150 |
29.5 |
266 |
7,850 |
17.3 |
Tumas 1 and 2 |
Probable |
150 |
13.9 |
292 |
4,090 |
9.0 |
Tumas Project Sub-Total |
88.4 |
346 |
30,540 |
67.3 |
||
Western Australia |
||||||
Mulga Rock Project – JORC 2012 2 |
||||||
Ambassador |
Proved |
150 |
5.3 |
1,055 |
5,580 |
12.3 |
Ambassador |
Probable |
150 |
14.1 |
775 |
10,890 |
24.0 |
Princess |
Proved |
150 |
- |
- |
- |
- |
Princess |
Probable |
150 |
1.7 |
870 |
1,500 |
3.3 |
Mulga Rock East Total |
21.1 |
852 |
17,970 |
39.6 |
||
Shogun |
Proved |
150 |
- |
- |
- |
- |
Shogun |
Probable |
150 |
1.6 |
760 |
1,225 |
2.7 |
Mulga Rock West Total |
1.6 |
766 |
1,225 |
2.7 |
||
Mulga Rock Project Sub-Total |
22.7 |
845 |
19,195 |
42.3 |
||
GRAND TOTAL ORE RESERVES |
|
111.1 |
275 |
49,735 |
109.6 |
Notes:
Figures may not add due to rounding.
1ASX Release 2 February 2023 ‘Strong Results From Tumas Definitive Feasibility Study’
2 ASX Release 4 September 2017 ‘Major Ore Reserve Update – Moving to the Go Line’